Session MB-49: Integrated lot-sizing problems in stream Lot Sizing, Lot Scheduling and Production Planning
Monday, 10:30-12:00Room: M1 (building: 101)
Session chair(s): |
|
1139. Population-based search algorithms for an integrated scheduling problem in the pharmaceutical two-stage supply chain |
Byung Soo Kim
[R] - Korea, Republic of | accepted | ||
Seung Jae Lee
[R] - Korea, Republic of | ||||
1779. Integrated Scheduling of Continuous Casting and Hot Rolling in Steel Production: Modeling as a Two-stage Lot Sizing/Assignment Problem |
Hubert Missbauer
[R] - Austria | accepted | ||
Alexander Lohr
[] - Austria | ||||
Julian Fodor
[] - Austria | ||||
771. Hybrid Biased Random Key Genetic Algorithm For The Capacited Multi-Period Cutting Stock Problem with Setups |
Eduardo Silva
[R] - Brazil | accepted | ||
Silvio Alexandre de Araujo
[R] - Brazil | ||||
Antonio Chaves
[] - Brazil | ||||
Raf Jans
[] - Canada | ||||
603. Integrated lot-sizing and cutting stock problem applied to lattice slab production |
Silvio Alexandre de Araujo
[R] - Brazil | accepted | ||
Caroline de Arruda Signorini
[] - Brazil | ||||
Raf Jans
[] - Canada | ||||